Wednesday, June 16, 2010

Final Inspection - Restrooms

June 16, 2010 -

We are so close to done with the Phase 1 Restroom project!  There are only a few details to take care of and we will hopefully be able to open them and the main entry this weekend!  All we need is the final inspection from the city building official!


George helping out with the construction clean-up!

Wednesday, June 9, 2010

Parking Lot

- Before -

June 9, 2010 -

Parking lots are a little bit like roofs.  They require maintenance and sometimes fairly major maintenance.  Fortunately, our parking lot is in good condition overall.  We have noticed increased cracking and deterioration, so we made the choice to do some needed preventative maintenance.  We have had the cracks ground out and filled.  Today the majority of the parking lot is being oiled and rocked.  The contractor will be back in a week or so to do some patching and then we will re-stripe the parking and playground lines.

Please do not drive on the parking lot until Friday June 11th.  Parking is available on High Street and the gym door on that side of the building is open for all to use.

- During -

Wednesday, June 2, 2010

It's That Time of Year!

June 2, 2010 -

School is almost done for the year!  Only 1/2 a day tomorrow and the students are off for the summer.  That means it must be time to wax the floors in the class rooms!  Sorry about all the tables, chairs, desks and all sitting in the hallways.  It is temporary.  All those items will go back into the class rooms soon.


Freshly waxed floor in Head Start Classroom.